Dear Daniel,
Just a note to thank you and let you know that the window installation went well at Charter House the YMCA building and your training for the Stronghold system really useful.
All concerned, operatives, customer and tenants were all impressed with the method of installation and the use of the Stronghold.
The savings on scaffolding was immense due to the staircases being at each end of the building and both 10 floors tall. I would estimate the savings at £20,000.00 at least and the safety greatly enhanced by using the Stronghold rather than scaffolding.
I will be in touch for training new operatives in the future.
Yours sincerely
Ken Richardson
Dear Daniel,
I just want to take this opportunity to feedback on how stronghold has supported our business needs since we purchased the product in December 2014.
We had obtained a 5 year contract to undertake maintenance on 5x 24 story tower blocks in Camden, London (700+ apartments). I was looking for a cost effective way in which to
carry out this work and came across your product alongside another product that the French equivalent to the SAS use to abseil out of buildings. Both myself and my Client
decided that the Stronghold was by far the better product for the project, our client especially liked that it has it’s own barrier system there by keeping unauthorised personnel
out of the working area, ensure safety requirements are adhered to.
The benefit of Stronghold is it is easily transported and erected, we leave this equipment on one of our vans at all times in case of emergencies (please see attached email).
Scaffolding was not an option for our client as would have cost in excessive of £2 million.
My Engineers are fully trained in using Stronghold and feel completely safe when using this. They have said that they feel it was a much safer option than standing on scaffolding
or abseiling on the outside of a high rise building.
We have been using this product for over a year with no issues at all, we have undertake the project we bought the stronghold for but as a result of purchasing this product we have
secured a further 7 year contract as this has given our company the competitive edge. We also use Stronghold on our other contracts where sometimes we could be working of a
ladder, now we work from the inside and lean out whilst be attached to the Stronghold.
Engineers again feel this is a much safer alternative to a ladder, and I would agree.
By also offering this product to other Clients I am able to offer alternatives to traditional and costly methods which has seen my business grow as a result.
I am looking at further ways Stronghold can help grow my business and would not hesitate to recommend this product to others.
Kind Regards
James Mann
Director
ABC Locksmiths
No scaffold has allowed us to reduce the job cost for our clients, which has since led to us win more work, we are also winning jobs where scaffold had been refused. We have also been able to start and complete jobs quicker (without relying on a scaffolding company to erect and pack up their gear), Other parts of the buildings we have worked on have been able to operate as usual without being temporarily defaced by scaffold and most importantly for us our staff can now work from inside and not at height on the scaffold.